RWA/GHS Consent Form

Resident Welfare Associations (RWAs) and Group Housing Societies (GHS) in Delhi can give consent for installing a Rooftop Solar (RTS) system in their premises under the Delhi Solar Energy Policy, 2023. A society can apply for a total solar capacity of up to 500 kW, including any solar capacity already installed. Please read the information below and keep it ready before you fill the consent form.

Information You Need Before Applying

  1. Common area CA numbers of the society: The main CA number of the society's common area electricity connection, along with the mobile number registered with the DISCOM (BSES Rajdhani / BSES Yamuna / Tata Power-DDL) for that CA number, which will be verified by OTP. If your society has more than one common area connection (for example, for street lights, lifts, water pumps, etc.), keep all those CA numbers ready as well.
  2. Total solar capacity already installed in the society (in kW): The total solar capacity already installed in the society, including all common area connections. This is used to work out the remaining capacity the society is eligible for (500 kW minus the capacity already installed).
  3. Society and plant details:
    • Number of households in the society
    • Number of blocks / towers
    • Approximate height of the blocks (in metres)
    • Available rooftop area (optional)
    • Email ID (optional)
    • Revenue district
  4. Letterhead, signature and stamp: The consent form generated on the portal must be printed on the letterhead of the RWA / GHS, signed and stamped by the authorised signatory of the RWA / Society, and uploaded (PDF, JPG or PNG, maximum 5 MB).
  5. Connection and solar plant type:Keep the following information ready (hover over each option to see what it means):
    • Electricity connection type of the society: Single Point or Multi Point
    • Solar plant required for: Common Area or VNM

Steps to Apply

  1. Open the consent form: Click the "Fill RWA/GHS Consent Form" button below.
  2. Society details: Enter the main common area CA number, select the DISCOM, and verify the mobile number registered with the DISCOM by OTP.
  3. Common area CAs: Add the other common area CA numbers of the society (if any) and enter the total solar capacity already installed.
  4. Plant details: Check the capacity you are eligible for, and fill in the society and plant details.
  5. Upload consent: Generate the consent form, print it on the RWA / GHS letterhead, get it signed and stamped by the authorised signatory, and upload it.
  6. Submit: Submit the form. You will receive a Reference ID by SMS on the registered mobile number.
  7. Further processing: Your consent is subject to technical feasibility clearance of the site. The concerned DISCOM will contact the RWA / Society for the next steps.
Note: Virtual Net Metering (VNM) is currently not available, as it has not yet been activated by MNRE. It will be available as soon as MNRE activates it.